Timber, stone, daylight.
Very little else.
How we work
From the first walk on site to the last board on the wall.
01 · Read the site
We walk the site in every season we can, and measure where the sun and wind come from.
02 · Draw by hand
The first ideas are pencil on tracing paper, on the table with the client.
03 · Build it small
Cardboard models show what drawings hide: light, scale, the walk to the door.
04 · Stay to the end
We follow every building on site until the day the keys are handed over.


Nordic Timber Award 2025 · Arctic Architecture Prize 2024 · Daylight Prize 2023 · Coastal Housing Award 2022

Why we still build models by hand
Screens are good at showing a building. Cardboard is better at showing what is wrong with it.

Designing for two hundred days of rain
In western Norway the weather is not a problem to solve. It is the brief.

Havnvik Library wins the Nordic Timber Award
The jury called the reading hall “a forest you can sit in”. We will take that.






